Successful Completion of Residential Development at Liscappagh (Cappaghfinn Phase 3), Finglas, Dublin 11.

October 10, 2023

ABM are delighted to announce the recent delivery and hand over of 69 No. Accelerated Delivery social dwellings and the associated site works at Liscappagh (Cappaghfinn Phase 3), Cappagh Road, Finglas, Dublin 11 on behalf of Fingal County Council.

The development comprised of the design and construction of  quality living accommodation with a cumulative total of 33 No. houses and 36 No. apartments, consisting of three-bedroom, five-person, two storey terraced houses: two-bedroom, four-person, two storey terraced houses: and one bedroom, two-person one storey, which sit comfortably in context with the surrounding environment.

The accelerated build method consisted of a structural frame comprising panelised light gauge steel frames (LGSF) with integrated insulated wall panels built off site and delivered flat packed to the site for completion and delivery in a very short time period.

In addition, the residential project has achieved a BER A2 rating using triple glazed, low conductivity, well insulated windows and door, air-tight membranes and are built to a very high standard, meeting the requirements of Fingal County Council.

Congratulations to all the ABM Team involved.