National Rehabilitation Hospital, Rochestown Avenue, Dun Laoghaire, Co. Dublin
Project Overview

National Rehabilitation Hospital, Rochestown Avenue, Dun Laoghaire, Co. Dublin

Medical

The project consisted of three parts:

Pharmacy Fit -out: The  development  consists  of  the  fit-out  of  an  existing,  vacated  ward  in  the  original  hospital building into a new Pharmacy Suite. Ancillary works to adjacent areas will also be required to facilitate the works.

Spinal Therapy / Office: The development  consists  of  the  fit-out  of  an  existing  open  plan  area  within  a  live  therapy gym. Ancillary works to adjacent areas will also be required to facilitate the works.

External Lift: The development consists of the installation of new external lift into existing concrete shaft, along with new steel / glass enclosure and control room. Ancillary site works will be required to facilitate the works.

 

 

Download Fact Sheet
  • Client

    Health Service Executive (HSE)

  • Location

    Rochestown Avenue, Dun Laoghaire, Co. Dublin

    Stage

    Completed October 2023

  • Client

    Health Service Executive (HSE)

  • Status

    Completed October 2023

Project Details:

ABM coordinated and liaised with those working in the live environment to ensure disruption is minimised. Protection of the public and staff was of paramount concern in a live hospital environment.

Management, delivery & control of the mechanical and electrical work specialists on site with multiple connections into existing live hospital services maintaining life safety systems in the main hospital throughout the works.

ABM provided a detailed programme and schedule for phased delivery, daily co-ordination with the Hospital was required to ensure the Hospital operations were not impacted during the works.

BCAR compliance including Design Certifier and Contractor's Certification and performing all duties of PSCS.

Comply with requirements of Fire Certificate and DAC Certificate and liaise with NRH and their agents.

All Testing Certificates was provided to the Assigned Certifier as the works and testing progresses.

Commissioning of building and ancillary services and handover of complete ‘in full working order’ Certify and complete the project in accordance with the new  construction is fully certified.

Provision of all certifications, maintenance manuals, health and safety records and documentation required under the contract in accordance with current legislation and regulation on completion of the works.

Hand over completed and ready for occupation on or before Completion Date. The requirement was for a turn-key provision, i.e. building ready to be used immediately by the NRH Management.