Project Details:
In July 2013, the Department of Education prioritised funding to facilitate the construction of schools in rapidly developing areas such as Saggart, Co. Dublin. Scoil Mhuire National School was tendered on a design and build basis in October 2013. It was intended that the school would be operational by the start of the school term in September 2014/15. The commencement date was 20th January 2014 and construction of the school was completed within a 32-week programme.