Community Nursing Unit at St. Brigid’s Hospital, Ballinasloe, Co. Galway. (50 Beds)
Project Overview

Community Nursing Unit at St. Brigid’s Hospital, Ballinasloe, Co. Galway. (50 Beds)

Medical

The Ballinasloe CNU development consisted of the construction of a community nursing unit, which was cruciform in plan, comprising a one-storey L-shaped wing containing an entrance hall, vertical circulation, treatment suite, prayer room, dining and day rooms, catering kitchen, staff and ancillary facilities, plant rooms and ESB substation. It also included a two-storey L-shaped wing which contained 50 no. bed spaces in single and shared rooms with en-suite bathrooms, day-dining rooms, offices, support facilities and site works, including roads and footpaths, 28 no. car parking spaces, 3 no. gardens and a service yard, measuring a total of 3,179 sq. m in area.

ABM has constructed 5 no. 50 and 100 bed CNU’s for the HSE on a design and build basis.

Download Fact Sheet
  • Client

    Health Service Executive

  • Location

    Ballinasloe, Co. Galway

    Stage

    Completed February 2010

  • Client

    Health Service Executive

  • Status

    Completed February 2010

Project Details:

  • The pods were specifically designed to cater to the end user and incorporate all building regulations, with specific emphasis on TGD Part M.
  • The pod specification consists of a steel cube like rigid structure with continuous weld joints to a total height of 2517 mm. This unit is finished internally to match a specified finish within the room in which the pod is amalgamated.
  • A high standard ironmongery and internal finish is incorporated into each pod. These include the installation of ironmongery, sanitary ware, tiling, light fittings switches, accessories, mechanical services (plumbing connections of hot & cold mains water supplies, waste outlets, extraction fans) and electrical services (supply and component installation such as wiring).
  • All installations are integrated during manufacture leaving the simplistic process of simply connecting the service tails to the building’s main services once the pod is installed on-site. Each pod leaving the factory is fully fitted, fully tested and built to exact specifications, with every detail considered and checked. They are craned into position on-site and the necessary mechanical & electrical connections are made.

Quality Control:

  • The manufacturer operates within a controlled environment. They achieve levels of quality and consistency that may be hard to attain on-site due to externalities.

Control of Time Frame:

  • Using off-site construction as a rapid form of construction, delivery times can be guaranteed.

Control of Costs:

  • Off-site construction is very competitive; finished pods can be delivered to site at exactly the right time to slot in with the construction programme. The overall size of work force required on site is reduced, less risk of accidents, lower insurance premiums & minimal waste disposal on site.

Control of Information:

  • By using off-site construction, the pod is seen as a package which all trades are involved in from the out-set. This generates an inclusive, pro-active sharing of information, the end result being a pod solution delivered to site which fits seamlessly.
  • Windows - Glazing consisting of thermally broken aluminum profiles extruded from aluminum alloy complying with BS1474 with 24 mm double glazed units with low ‘e’ argon filled glazing units were installed.

Components

  • Door Systems - To facilitate an advantageous programme, advanced planning composite door sets were used. These door systems ensure total compatibility of sizes, materials and performance.
  • Roof Systems - The advantages of this particular prefabricated roof system are quality control, cost of construction, rapid installation, roof shapes - Any roof shape such as gables and hips can be achieved. Trusses are custom made to any design, pitch or span to suit that particular building.
  • The advantages of this type of roof finish is that it can be installed simultaneously with other building elements to allow the building to become watertight. This helps to create an internal working environment for all internal trades.

Structural Fusion System:

  • The building was constructed with a high emphasis on build quality & durability using an IBA certified Fusion steel framed building system. The Fusion system is craned into position on-site with extreme efficiency with regard to installation and programme.

Sustainability:

Off-site manufacturing works in hand with sustainability for the following reasons:

  • Up to 67 per cent less energy is required to produce a system build compared to an equivalent traditionally-built project.
  • Off-site manufacturing can generate up to 90 per cent fewer vehicle movements to site, reducing carbon emissions, congestion and disruption.
  • Off-site construction can reduce on-site waste by up to 90 per cent.

Substation - This project involved the construction of integrated Electricity sub-stations in accordance with ESB Networks guidelines and specifications. Incorporated along with these buildings was a corresponding customer switch room to accommodate mains boards, switch gear and meter points.

Civil works - included provision of cast in situ concrete bases and plinths, forming and construction of cast in-situ duct channels and pits, supply and install of earth mats and provision for a 4 hr fire resisting enclosure. All mains cable ducting to ESB Networks nominated connection points included all mini-pillars vaults, joint boxes and earthing points were included in our scope. Adequate provision for vehicular access was also allowed for in design and location of the Sub-Station enclosure.

External finishes - were applied to match with that of the surrounding buildings.